Methodology

This page explains how our tools produce their numbers, where cost data comes from, and what the results can and cannot tell you.

Two kinds of tools

Calculators apply standard formulas to the numbers you enter. A mortgage payment, a room’s square footage, or the cubic yards in a slab has one correct answer for a given set of inputs. Each calculator page shows its formula and a worked example so you can check the result yourself.

Cost estimators are different. No formula can say what a roofer in your town will charge. Estimators apply published cost ranges to the size and scope you describe, and return a planning range.

How calculations work

All tools share one calculation engine with six parts:

  • Financial — loan payments, amortization schedules, growth over time.
  • Mortgage — full housing payments, loan-to-value, mortgage insurance timing, affordability.
  • Measurement — areas and volumes in U.S. units.
  • Material — waste allowances, coverage, and rounding up to whole packages.
  • Cost estimation — multiplying published ranges by quantities, adding separate line items, and labeling each line’s origin.
  • Decision — comparing two options on a common basis and finding break-even points.

Calculations run in your browser. The numbers you enter are not sent to us.

How cost estimates are produced

  1. You enter the size and scope of the project: roof area and material, kitchen size and level, number and type of windows.
  2. The estimator looks up the published low and high figures for that scope in a cost-data file.
  3. It multiplies by your quantity, adds any optional lines you select (permits, removal), and applies your local adjustment if you set one.
  4. It rounds calculated results outward — the low end down and the high end up — so they never imply more precision than the data has. A range shown exactly as the source published it is not rounded.

How ranges are combined, and when they are not

Our rule: published ranges may only be combined when the source explicitly supports the combination. Independent ranges are never intersected or mathematically merged to create an estimate the source did not publish.

In practice that means an estimator does only three kinds of arithmetic:

  • Multiply a published per-unit range by your quantity — dollars per square foot times your square feet, dollars per window times your window count.
  • Add separately published line items for separate pieces of work — a permit, removal of old flooring, new ductwork — and only when you select them.
  • Apply a percentage you set — the local price adjustment or a contingency.

When a source publishes two independent breakdowns of the same project — bathroom cost by scope and by bathroom type, window cost by frame material and by style, water heater cost by type and by tank size — and no figure for a specific pairing, the estimator asks you to choose one view and shows that published range. It does not blend the two.

Each line of a result is labeled so you can tell what it is:

  • Source-backed range — a figure shown as the source published it.
  • Calculated — our arithmetic on a published figure and your input. The source did not publish this number.
  • Your input — a value or percentage you entered.
  • MyHomeMetric assumption — a default or simplification we chose, explained on the page.

Data sources

Cost data comes from published U.S. consumer cost guides. Every dataset records its publisher, title, link, publication date, geographic scope, and the date we last reviewed it. The same information appears on each estimator page. The current datasets are:

Cost datasets, sources, and review dates
DatasetSource and publication dateLast reviewed
Bathroom remodelFixr (January 27, 2026)October 4, 2026
Flooring installationHomeGuide (February 5, 2026)October 4, 2026
HVAC replacementAngi (August 3, 2026)October 5, 2026
Kitchen remodelFixr (January 27, 2026)October 4, 2026
House paintingNerdWallet (February 19, 2026)October 4, 2026
Home renovationAngi (March 17, 2026)October 4, 2026
Roof repairFixr (January 21, 2026)October 4, 2026
Roof replacementFixr (January 30, 2026); This Old House (September 10, 2026)October 4, 2026
Water heater replacementFixr (January 27, 2026)October 4, 2026
Window replacementFixr (January 21, 2026)October 4, 2026
Repair vs replace assumptionsInterNACHI (page copyright 2006–2026; no update date shown); ENERGY STAR (no date shown); U.S. EPA (no date shown)October 5, 2026

We chose sources that publish their figures openly and date them. We do not use data whose license prohibits use in calculators. We are not affiliated with these publishers, and citing them does not imply that they endorse MyHomeMetric. “Last reviewed” means the date we last compared our dataset with the source’s published page; it does not mean we independently verified the source’s own research.

What we do when data is missing

If we cannot find a reliable published figure for something, we do not make one up. Depending on the case, the estimator:

  • leaves that factor out and says so on the page (for example, our roofing sources publish no separate tear-off price or steep-pitch multiplier);
  • asks you for the number (mortgage rates, PMI rates, property tax rates, your own contractor quotes); or
  • offers an adjustment you control (the local price adjustment).

Assumptions

  • All amounts are in U.S. dollars and all measurements in U.S. customary units.
  • Cost ranges are national. They are not adjusted for your state or city unless you apply an adjustment.
  • Mortgage tools assume fixed-rate loans with monthly compounding and on-time payments.
  • Starting values in calculators are examples to show how the tool works. They are not current market rates or recommendations.
  • Tax, insurance, and other recurring costs stay at the amounts you enter unless a tool states otherwise.

Limitations

  • National ranges blend very different local markets. Your prices may fall outside them.
  • Published cost guides rely on surveys, contractor-submitted data, and estimating databases, each with its own biases.
  • Estimators cannot see your home. Hidden conditions such as rot, outdated wiring, or code upgrades are not in any estimate.
  • Prices change. A dataset can be out of date between reviews.
  • Financial tools leave out income taxes, and they cannot predict interest rates, home values, or investment returns.

Why an estimate is not a contractor quote

A quote is a specific contractor’s offer to do defined work on your home for a stated price. It reflects their inspection of the site, their labor rates and schedule, the exact products specified, and local permit requirements. An estimate from this site is built from averages and from what you tell it. Use estimates to plan, to set a budget, and to recognize quotes that are far outside the norm. Use written quotes to make the decision.

Update practices

  • Cost data is stored separately from calculator code, so figures can be updated without changing how a tool works.
  • Each dataset shows its source’s publication date and our last review date.
  • We review cost datasets at least once a year and when a source publishes a new edition.
  • Formulas are tested against worked examples whenever the engine changes.

Corrections

If you find an error in a calculation, a figure, or an explanation, tell us at our contact page. We correct confirmed errors and update the review date.

Last updated October 2026.