Concrete Calculator

Work out cubic yards for a ready-mix order, or the number of bags for a smaller pour.

The pour
Length
ft
in

Width
ft
in

in

in

Depth or height
ft
in

%

Your result will appear here.

How the volume is calculated

Slab: length × width × (thickness in inches ÷ 12) = cubic feet

Round: π × (diameter ÷ 2)² × depth = cubic feet

Cubic feet ÷ 27 = cubic yards, the unit ready-mix suppliers sell by.

Worked example

A 10 ft × 10 ft patio slab, 4 inches thick: 10 × 10 × (4 ÷ 12) = 33.3 cubic feet, or 1.23 cubic yards. With 10% extra that is 36.7 cubic feet — 1.36 cubic yards, or 62 bags of 80 lb mix.

Bags or a truck?

Bagged mix suits post holes, small pads, and repairs. A pour of a cubic yard or more means mixing dozens of bags before the first ones set, which is why larger slabs are usually ordered as ready-mix. Suppliers often have a minimum order or a short-load fee, so ask when you call.

Always order a little extra. Running short mid-pour leaves a weak joint, and subgrades are rarely perfectly level. Thickness requirements for driveways, footings, and structural slabs come from your local building code.

Common questions

How thick should a slab be?

Four inches is common for patios and walkways, with thicker slabs for driveways and anything carrying vehicles. Your local code and the intended load decide; check before you pour.

Why add 10%?

To cover uneven ground, forms that bow slightly, spillage, and the mix left in the wheelbarrow or truck chute.

Reviewed October 2026. Methodology