How to use the planner
Start with rough figures from the Home Renovation Cost Estimator, then replace them with contractor quotes as they arrive. The share next to each line shows where the money is concentrated, which is where a change of plan or product saves the most.
Why a contingency is not optional
Renovations uncover things nobody could see when the price was agreed: rot behind a shower, wiring that isn’t up to code, a subfloor that needs replacing. A contingency is money set aside for those discoveries, kept separate from upgrades you choose to add. Ten percent is a common starting point; older homes and projects that open walls or floors justify more.
If the plan doesn’t fit
You have three levers: scope, finish level, and time. Dropping a room, choosing mid-grade finishes where they are least visible, or phasing the work over two years all bring the total down without borrowing more. The renovation budget guide walks through each.
Common questions
Should the contingency be in my contract?
Usually not. It is your reserve. The contract should state how changes are priced and approved, so the contingency is spent only with your written agreement.
What goes in “Other”?
Dumpster rental, temporary housing or storage, cleaning, landscaping repair, and delivery fees are commonly forgotten.