How this estimate is built
Our source publishes one set of ranges by remodel scope and another by bathroom type. It does not publish a range for a specific combination, such as a partial remodel of a primary bathroom, so this estimator does not create one. Choose the view that best describes your project and you see that published range as reported.
If you enter a size, the estimator also multiplies the source’s per-square-foot range by your area. Those rows are labeled “Calculated” because the arithmetic is ours; the per-square-foot figures are the source’s.
Looking at both views is useful. If your project sits in the “partial remodel” range and the “primary bathroom” range, the figures both ranges share are the most likely territory, but that is a judgment for you and your contractor, not a published number.
The three scopes
- Minor update — paint, a new vanity top or faucet, lighting, accessories.
- Partial remodel — replacing several major elements, such as the vanity, toilet, flooring, and tub or shower surround, in the same layout.
- Full gut renovation — everything removed to the studs, often with plumbing or layout changes.
What moves the price
Bathrooms pack plumbing, electrical, tile, and waterproofing into a small space, so labor is about half the cost. Moving a toilet or shower drain is one of the most expensive changes. Tile choice and the amount of tiled wall area swing the materials budget, and water damage found behind old tile is a common surprise.
Plan the line items with the Bathroom Remodel Planner, and size tile orders with the Tile Calculator.
Common questions
Why can’t I pick a scope and a bathroom type together?
Because the source doesn’t publish a price for that combination, and combining two separate ranges would produce a number nobody actually reported. You can view each range on its own.
Why can a tiny bathroom cost so much?
Fixed costs don’t shrink with the room. A small bathroom still needs a plumber, an electrician, a tile setter, and the same fixtures.
Do I need a permit?
Often, when plumbing or electrical work is involved. Requirements are set locally, so check with your building department.
Reviewed October 2026. Methodology
